Frequently asked questions about water, wastewater, and permitting.

Short, sourced answers to the questions Canadian Shield is asked most, grouped by topic. Each answer names the regulator or the standard behind it where one exists, and links to the page that goes deeper.

Septic permits and sewage system classes.

Who issues a permit for a given property, and which class of system the Ontario Building Code applies to it.

Who issues a septic permit in the Sudbury and Manitoulin districts?

Public Health Sudbury & Districts is designated under the Ontario Building Code to inspect and issue sewage system permits across the Sudbury and Manitoulin districts, including unorganized territory. A permit is required for every class of system except Class 1 privies, and for replacements or modifications.

Who issues a septic permit near St-Charles, French River, or Killarney?

St-Charles, French River, Markstay-Warren, and Killarney move Ontario Building Code Part 8 permitting from Public Health Sudbury & Districts to Sudbury East Building and By-law Services on November 1, 2026. Applications went to Public Health Sudbury & Districts until October 23, 2026 — confirm which authority covers the property first.

What class of septic system does my property need under OBC Part 8?

Under Part 8 of the Ontario Building Code, sewage systems are classed 1 to 5: Class 1 privies, Class 2 greywater leaching pits, Class 3 cesspools, Class 4 septic tank with a leaching bed, and Class 5 holding tanks. A qualified designer confirms the class that fits a given site.

Wastewater management and remote treatment.

What the work covers, and how temporary and remote systems are approved.

What does wastewater management include on a remote or regulated site?

The whole path from site constraints to a system that can be built, approved, and maintained: assessment, design, technology selection, permitting support, installation coordination, and ongoing operation and maintenance. Canadian Shield scopes that path for remote, seasonal, and regulated sites.

What is pre-approved mobile wastewater treatment?

A containerized or mobile treatment system deployed to a temporary, seasonal, or remote site while a permanent servicing path is planned. Canadian Shield holds Environmental Compliance Approvals covering mobile sewage systems at remote construction camps across Northern Ontario, which streamline design and deployment.

What approvals cover a mobile sewage system at a remote camp?

Under the Ontario Water Resources Act, an Environmental Compliance Approval is generally required for sewage works above 10,000 litres per day, works serving multiple properties, and works not wholly on the property they serve. Canadian Shield's own Environmental Compliance Approvals cover mobile sewage systems at remote construction camps across Northern Ontario.

Drinking water systems.

Engineering reports, sampling intervals, and operator requirements for regulated and non-municipal systems.

What does a drinking water system engineering report contain?

A useful report describes the existing system, the raw water characteristics, the planned changes, and how the upgraded system will be operated and monitored. It accounts for current occupancy and expected demand, treatment already installed, and the monitoring obligations the system will carry once the upgrade is in service.

How often must a small drinking water system in Ontario be sampled?

Under O. Reg. 170/03, non-municipal year-round residential systems sample treated distribution water at least every two weeks — and weekly where the system is exempt from treatment — with monthly raw water samples from each well for groundwater sources. Seasonal and smaller non-residential systems sample at least monthly.

Environmental approvals and site assessment.

Which approval route applies to a project, and what the assessment work actually involves.

Do I need an Environmental Compliance Approval for sewage works in Ontario?

It depends on the works. Under the Ontario Water Resources Act, an Environmental Compliance Approval is generally required for sewage works with a design capacity over 10,000 litres per day, works serving multiple properties, and works that are not wholly on the property they serve. Smaller systems follow the Ontario Building Code permit route instead.

What is the difference between an Environmental Compliance Approval and an EASR registration?

An Environmental Compliance Approval is an individual ministry approval. The Environmental Activity and Sector Registry is a self-registration route for lower-risk activities that follow standard requirements. For wastewater work in Ontario, registered activities include storm water management works and sewage works used solely to dewater a construction site.

What is the difference between a Phase I and a Phase II Environmental Site Assessment?

A Phase I Environmental Site Assessment is a records-review-and-interview exercise that identifies contamination potential without disturbing the site. Phase II work involves soil sampling, plus groundwater or sediment sampling where conditions call for it. A Qualified Person sets the scope, and the results support a Record of Site Condition where one is required.

How long does an Ontario sewage approval take?

There is no fixed timeline. The duration depends on the completeness of the application, the ministry's review cycle, and whether the site conditions raise questions that need more information. The practical lever available to project owners is preparation: complete documentation describing a site that has been properly characterized usually produces fewer rounds of revision.

Mining and remote industrial camps.

How remote sites are sized, built, and serviced where access and timing decide the plan.

What treatment approach fits a mining camp or remote industrial site?

Remote and industrial projects usually start with flow, access, season, and receiving environment, then weigh containerized or mobile treatment against a permanent onsite system. Canadian Shield supports site assessment, technology selection, documentation, supply coordination, installation support, maintenance planning, and troubleshooting on those projects.

What size mining camp can Canadian Shield treat wastewater for?

Canadian Shield has delivered water and wastewater approaches for remote mining camps supporting 50 or more personnel in extreme cold, fly-in-only locations. The suitable option is identified based on the location and the size of the working camp you plan to establish, so the camp size and site conditions are the first things to share.

How fast can a containerized wastewater system be commissioned?

On one project, a containerized system was assessed, delivered, installed, commissioned, and handed over within a one-week window so a mining operation could increase its workforce by 200 people without shutting down operations. Timelines depend on site conditions, access, and scope, so each project is scoped individually rather than quoted from that example.

How do you install and service a system at a fly-in site?

Installation logistics can include helicopter-slung modular units into remote sites, winterized construction using local workforces, onsite training for camp operators, and annual fly-in maintenance programs. Access is planned up front: equipment, service visits, and replacement parts are scheduled around travel windows rather than treated as an afterthought.

Campgrounds, wineries, and seasonal properties.

How the same treatment question changes with the site, the season, and the operating calendar.

What wastewater support do Ontario campgrounds and seasonal properties need?

Campgrounds, resorts, lodges, wineries, parks, and seasonal properties typically need wastewater and septic design, upgrade or expansion support, drinking water planning, and sometimes rainwater harvesting — planned around occupancy, operating season, and the approval path.

What should an Ontario campground plan before expanding?

Expansion can trigger wastewater, drinking water, servicing, or approval questions, so planning early helps avoid expensive rework after cabins, pads, production areas, or amenities are already designed. The review looks at seasonal peaks and event loads, property layout — bedrock, slopes, access lanes, wells, lakes, and neighbouring uses — and the approvals needed before construction commitments are made.

Can an over-budget system design be reworked?

Yes. For a mobile park in St-Charles, Ontario, a redesign around an EnviroSeptic approach eliminated high-cost components such as oversized tanks and deep trenches and cut material volume by more than 40% while keeping the design compliant. The redesigned system was approved and installed in 2014, secured MECP approval with full compliance, and has operated since installation.

Aggregates, construction, and site work.

What the quarry produces, what the field crews handle, and where the material goes.

What aggregates does Canadian Shield supply and where does it deliver?

Granular A and B, crusher run, clear stone, screened and winter sand, rip rap and gabion stone, armor stone, topsoil, and recycled concrete come from the St-Charles quarry. Delivery is available across Northern Ontario with same-day and next-day service in most areas, or customer pickup six days a week.

Do you handle demolition site clean-up?

Yes. Canadian Shield moves, hauls, and disposes of the waste and materials left after a demolition, licensed under Ontario Regulation 347 with MECP-approved disposal. The work sits in the construction services line and is shown on the demolition site clean-up project page.

First Nations and remote communities.

How community-scale water and wastewater projects are scoped, documented, and supported.

What does Canadian Shield do for First Nations and remote community water projects?

Support covers assessment, system review, treatment selection, monitoring, maintenance planning, and practical documentation for community-scale water and wastewater needs. The team also brings experience serving remote and First Nations communities across Canada, including modular, containerized treatment systems for off-grid sites and long-term maintenance and operator training programs.

What documentation should we have ready for a funding conversation?

Clear records support coordination, approvals, monitoring, and future funding conversations, so assessment, system review, and monitoring documentation is organized for community-scale projects as the work happens. That way the documentation is already in place when a funding discussion starts, instead of being assembled afterwards.

Has Canadian Shield worked on funded Indigenous water projects?

Canadian Shield has participated since 2023 in the One Water project, which unites Indigenous communities in Mexico and Canada to enhance water resilience through rainwater harvesting. The Commission for Environmental Cooperation awarded $200,000 to Canadian and Mexican organizations for the work — a joint effort with Isla Urbana and the University of Toronto's Center for Global Engineering involving Nipissing First Nation and three Mexican communities — and a rainwater harvesting system was installed at Nbisiing Secondary School in North Bay in 2024.

Rainwater harvesting.

Rainwater harvesting in Ontario usually starts with one question — is it legal — before sizing, treatment, or cost come into it.

Is rainwater harvesting legal in Ontario?

Yes, within regulated limits. The Ontario Building Code regulates how rainwater systems are designed, installed and used rather than prohibiting collection. Non-potable uses such as toilet flushing and irrigation are standard; using harvested rainwater for drinking requires treatment to the CSA B805 standard and local approval.

Every service page, in one list.

The FAQ hub is a starting point, not a substitute for a site review. These are the service pages behind the answers above.

Have a remote, regulated, or difficult water/wastewater project?

Tell Canadian Shield what you are planning, where the site is, and what problem needs to be solved. The team can help identify the right next step.